Presentations

COWI on challenges and future trends of substation jacket foundation design for very deep water

COWI on challenges and future trends of substation jacket foundation design for very deep water

COWI shared unique design ideas adopted in projects at last year's Offshore Wind Power Substations conference. Read the presentation and find out more about challenges of the substation foundation design, from procurement, fabrication and installation perspective.

Atkins Presentation: Return on Experience from the Foundation Design of Numerous Offshore Substations

Atkins Presentation: Return on Experience from the Foundation Design of Numerous Offshore Substations

Mathieu Guinard, Principal Geotechnical Engineer, Atkins, United Kingdom, presented at last year's "Offshore Wind Power Subsattions" on the experience made from concept through to installation of numerous offshore substations in European waters.

TenneT Presentation: The Road to 2GW Offshore HVDC Grid Connections

TenneT Presentation: The Road to 2GW Offshore HVDC Grid Connections

Learn more about the offshore HDVC grid connections by reading this presentation prepared by Marien Ruppert, Asset Management TenneT

TenneT Presentation on "The future of Offshore Grid Connections"

TenneT Presentation on "The future of Offshore Grid Connections"

Download now for free the TenneT past presentation by Marien RuppertAsset Manager at TenneT Netherlands. Learn more about:

Case study IJmuiden Ver (NL) & Zone 3 (GE)

• Powerlink Islands or HVDC platforms

• Cost drivers, saving potential and more

Download the presentation here:

Iberdrola Renewables case study - Wikinger substation: From scratch to production

Iberdrola Renewables case study - Wikinger substation: From scratch to production

With the constant changes in technology, the offshore wind power substations require more and more complex implementation processes. Would you like to expand your knowledge within this area? 

Download the case study "Wikinger substation: From scratch to production" presented by Alfonso Martinez Carminero, OSS Package Lead at Iberdrola Renewables in Spain that you read for free here:

EnBW Energie Baden-Württemberg: Experiences and lessons learnt with Baltic 1  and 2 OSS

EnBW Energie Baden-Württemberg: Experiences and lessons learnt with Baltic 1 and 2 OSS

Friedrich von Storch, Manager Operations Wind Offshore, EnBW Energie Baden-Württemberg AG, Germany, presented at last year’s „Offshore Wind Power Substations“ experiences and lessons learnt with Baltic 1  and 2 OSS. Read the full presentation to find out more.

Wikinger substation: From scratch to production

Wikinger substation: From scratch to production

Alfonso Martinez Carminero, OSS package lead, Iberdrola Renewables, discusses in this exclusive interview all details regarding the Wikinger offshore substation.